He said that under this policy, work is being done to remove dredged soil with the coordination of the local administration and relevant stakeholders. As a result, it will be possible to maintain the navigability of rivers and canals in the long term.
Highlighting the likely benefits of the project, the State Minister said that if the project is implemented, normal water flow will return to the Karatoya River. By using the water conserved in the river, it will be possible to increase the production of rice and various winter crops. This will increase the income of farmers and ordinary people. Alongside, through tree plantation, the project will also play a positive role in maintaining the environmental balance of the area.
It may be mentioned that to restore the navigability of the Karatoya, Ichamati and Gazaria rivers in Bogura and Gaibandha districts, remove siltation and waterlogging, and reduce flood risk, the ‘Karatoya River System Development Project’ has been undertaken at a cost of Tk 1,094.35 crore.
On 16 June 2026, the project was approved at a meeting of the Executive Committee of the National Economic Council (ECNEC). The project is planned to be implemented over four years from July 2026 to June 2030.
Under the project, river re-excavation, embankment protection, construction of water control infrastructure, and expansion of irrigation and drainage facilities will be carried out. Alongside, initiatives have been taken to increase agriculture and fisheries production and create employment. In addition, there is a plan to plant 5,250 fruit, timber and medicinal trees in the project area.




