The Ministry of Power, Energy and Mineral Resources said emergency work to restore power connections has begun. Power has already returned to most areas, and supply will be ensured in the remaining areas within a short time. Power Grid Bangladesh said engineers are restoring the system step by step under the control of the National Load Dispatch Center (NLDC). However, electricity supply is fully normal in the northern region and other areas of the country.
National
Grid failure due to mechanical fault, multiple areas in Dhaka and Chattogram without power
Dhaka Magazine Desk
Published: Tuesday, 27 October 2026
1 min read
Regarding the overall situation, Bangladesh Power Development Board (BPDB) Chairman Md. Rezaul Karim said grid repair work is ongoing and the situation will become normal very soon.
More to Read
-
11 more die of dengue, 2,071 hospitalized in a dayTuesday, 27 October 2026
-
Another 7 children die of measles and symptoms in the country; total death toll 1,240Tuesday, 27 October 2026
-
Bangladesh wants to use Pakistan's experience in food storageTuesday, 27 October 2026
More from this category
-
11 more die of dengue, 2,071 hospitalized in a dayTuesday, 27 October 2026
-
Another 7 children die of measles and symptoms in the country; total death toll 1,240Tuesday, 27 October 2026
-
Bangladesh wants to use Pakistan's experience in food storageTuesday, 27 October 2026
-
Health sector has fallen behind due to fascist rule and corruption: PresidentTuesday, 27 October 2026
-
China to assist in modernization of Bangladesh PoliceTuesday, 27 October 2026